Top best answers to the question «What is the purpose of the grand ethiopian renaissance dam»

The dam is in the Benishangul-Gumuz Region of Ethiopia, about 45 km (28 mi) east of the border with Sudan. The primary purpose of the dam is electricity production to relieve Ethiopia's acute energy shortage and for electricity export to neighboring countries.

8 other answers

The Grand Ethiopian Renaissance Dam will facilitate flood protection in the lower areas, irrigation, sediment control and navigation. Image courtesy of Giustino. The diversion of the Blue Nile river through four new culverts is underway.

Egypt, Sudan and Ethiopia have been negotiating for nearly a decade to reach an agreement on key outstanding issues related to the impact of the $4.6bn Grand Ethiopian Renaissance Dam (GERD) on ...

In 2011, Ethiopia announced to build a hydroelectric dam on its Abbay River, known to outsiders as the Blue Nile or Nile River. The dam was named the Grand Ethiopian Renaissance Dam (GERD) because it was designed to bring about the economic and renewal of Ethiopia, a nation mentioned in Genesis 2:13 as the Land in which the River Ghion (or Nile) flows.

Construction for the $4.8 billion the GERD begun in April 2011. The Dam, which draws water from the Blue Nile, should hold 74 billion cubic metres. It is expected to generate up to 6,000 megawatts of power and in doing so address Ethiopia’s energy insecurity: around 60 million Ethiopians have no access to electricity or very limited access.

This project focuses on the multipurpose use of the Grand Ethiopian Renaissance Dam, particularly for the sustainable energy-water-food-ecosystem service nexus at the national level. I applied the combination of methods

The purpose of this project is to outline the current situation surrounding the construction of the GERD. This project describes requirements that must be met before the completion of the dam construction among these strong engineering design, sufficient funding, political agreement, and thorough consideration of all possible options.

The Grand Ethiopian Renaissance Dam, formerly known as the Millennium Dam and sometimes referred to as Hidase Dam, is a gravity dam on the Blue Nile River in Ethiopia under construction since 2011. The dam is in the Benishangul-Gumuz Region of Ethiopia, about 45 km east of the border with Sudan. The primary purpose of the dam is electricity production to relieve Ethiopia’s acute energy shortage and for electricity export to neighboring countries. With a planned installed capacity of 6.45 ...

The energy generated by the Grand Ethiopian Renaissance Dam will be used by the National Grid of Ethiopia to support the development in rural and urban areas of the country.